クレジットの発行元となる企業・団体・プロジェクトが実現した温室効果ガス排出削減量または吸収量を測定し、その信頼性・永続性・追加性等を独立した立場から検証しクレジットの質を保証する基準の名称(表示は略称)
クレジットの発行年度(認証基準の審査を通過し、当該クレジットの温室効果ガス排出削減量または吸収量を自社排出量に適応可能と定められた年度)
購入可能なオフセット量
9,845.67 トン
1トンあたりの価格(税込)
1,753円
ご希望の購入金額もしくはオフセット量を入力してください。
The purpose of this project (Longyuan Mulilo De Aar 2 North Wind Energy Facility) is to supply wind-generated electricity to the Republic of South Africa’s national grid. The project involves the installation of a new grid-connected wind farm at a site where no wind farm previously operated. Its installed capacity of 144 MW consists of 96 wind turbines and the associated infrastructure. Located in the Pixley Ka Seme District close to the town of De Aar in the Northern Cape Province (approximately 30 km northeast of the Longyuan Mulilo De Aar Maanhaarberg Wind Energy Facility), the wind farm was developed by Longyuan Mulilo De Aar 2 North (RF) (Pty) Ltd.In addition to expanding renewable wind energy production, this project has myriad co-benefits, from local job creation to the assurance of higher quality air for those living within the Northern Cape Province region, thanks to the prevention of environmental pollution from oil, gas, and coal-generated electricity.This project is both additional (it would not have happened without the carbon credit revenues that make the project financially attractive for investors) and permanent (the avoidance of the emissions that would have occurred from a non-renewable energy facility occur in perpetuity).